Abstract:It is suggested that the canal dug from Shashi Port to Shayang Port links up the Changjiang and the Han River, and the canal dug from Shayang Port to Shenjiaji Port meets the 10 000 t-grade fleets' shipping between Chongqing and Shanghai. The two canals and completed Three Gorge Project shorten the voyage by 250 km. Furthermore, it eliminates the scourge of floods which threaten the middle-lower reach plain of the Changjiang by draining floods at different times. It is one of the attached projects which complement water to lower reach of the Han River in the Middle Route Projent of Water Transfer South to North. Because of its great fenefits, the projects should be implemented as soon as possible.
收稿日期: 1996-01-25
引用本文:
刘盛佳. 开凿两沙,沙谌运河的初步探讨[J]. , 1996, 35(1): 0-0.
刘盛佳. PRELIMINARY STUDY ON THE PROJECTS OF DIGGING SHA-SHA CANAL AND SHA-SHEN CANAL. , 1996, 35(1): 0-0.